Some checks failed
Server CI / Postgres (shard 0) (push) Has been skipped
Server CI / Postgres (shard 3) (push) Has been skipped
BuildEnv Docker Image / build-image (push) Failing after 4s
BuildEnv Docker Image / build-image-fips (push) Failing after 4s
Migration Review & Release Notes / Generate migration review & release notes (push) Failing after 3s
Server CI / Build Environment (push) Failing after 3s
Server CI / Postgres (shard 1) (push) Has been skipped
Tools CI / check-style (mattermost-govet) (push) Failing after 4s
Server CI / Postgres (shard 2) (push) Has been skipped
Tools CI / check-style (mmgotool) (push) Failing after 3s
Server CI / Elasticsearch v8 Compatibility (push) Has been skipped
Server CI / OpenSearch v2 Compatibility (push) Has been skipped
Server CI / Postgres FIPS (shard 0) (push) Has been skipped
Tools CI / Test (mattermost-govet) (push) Failing after 3s
Server CI / Postgres FIPS (shard 1) (push) Has been skipped
Server CI / Postgres FIPS (shard 2) (push) Has been skipped
Tools CI / Test (mmgotool) (push) Failing after 3s
Server CI / Postgres FIPS (shard 3) (push) Has been skipped
Server CI / Run mmctl tests (push) Has been skipped
Server CI / Run mmctl tests (FIPS) (push) Has been skipped
Server CI / Merge Postgres Test Results (push) Has been skipped
Server CI / Merge Postgres FIPS Test Results (push) Has been skipped
Server CI / Check backport migrations (push) Has been skipped
Server CI / Check generated files (push) Has been skipped
Server CI / check-style (push) Has been skipped
Server CI / Vet API (push) Has been skipped
Server CI / Build mattermost server app (push) Has been skipped
Server CI / Server CI Complete (push) Failing after 2s
Server CI / Server CI Artifacts (push) Has been skipped
Server CI / Sentry Upload (push) Has been skipped
Server CI / Server CI Report (push) Failing after 5m1s
Server CI Nightly Race / Race Detector (push) Has been skipped
CodeQL / Analyze (go) (push) Has been cancelled
CodeQL / Analyze (javascript) (push) Has been cancelled
Webapp CI Cache Warm / Warm Webapp node_modules Cache (push) Has been cancelled
E2E CI Cache Warm / Warm E2E npm Registry Cache (push) Has been cancelled
API / build (push) Has been cancelled
Web App CI / check-types (push) Has been cancelled
Web App CI / check-lint (push) Has been cancelled
Web App CI / check-i18n (push) Has been cancelled
Web App CI / check-external-links (push) Has been cancelled
Web App CI / test (platform) (push) Has been cancelled
Web App CI / test (mattermost-redux) (push) Has been cancelled
Web App CI / test (channels shard 1/4) (push) Has been cancelled
Web App CI / test (channels shard 2/4) (push) Has been cancelled
Web App CI / test (channels shard 3/4) (push) Has been cancelled
Web App CI / test (channels shard 4/4) (push) Has been cancelled
Web App CI / upload-coverage (push) Has been cancelled
Web App CI / build (push) Has been cancelled
YAML Lint / yamllint (push) Has been cancelled
Push mirrored docker images / cd/Push mirrored docker images (push) Has been cancelled
docs-cd / Build and deploy docs (push) Has been cancelled
Docs CI / build (push) Has been cancelled
E2E Cache Warm: Cypress deps / Warm Cypress deps cache (push) Has been cancelled
Scorecards supply-chain security / Scorecard analysis (push) Has been cancelled
Server CI Weekly / Postgres FIPS (push) Has been skipped
Server CI Weekly / Run mmctl tests (FIPS) (push) Has been skipped
Server CI Weekly / Postgres with binary parameters (push) Has been skipped
Server CI Weekly / Build Environment (push) Failing after 1s
Server CI Cache Warm / Warm Go Module and Build Cache (push) Failing after 2s
Server CI Nightly Race / Build Environment (push) Failing after 1s
2.2 KiB
2.2 KiB
title, sidebar_position
| title | sidebar_position |
|---|---|
| Inactive contributions | 3 |
This process describes how inactive contributions are managed at Mattermost, inspired by the Kubernetes project:
-
After 10 days of inactivity, a contribution becomes stale and a bot will add the
lifecycle/1:stalelabel to the contribution.- If action is required from submitter, Community Coordinator asks if the team can help clarify previous feedback or provide guidance on next steps.
- If action is required from reviewers, Community Coordinator asks reviewers to share feedback or help answer questions. The Coordinator will follow up with reviewers until a response is received.
-
After 20 days of inactivity, a contribution becomes inactive.
- Community Coordinator asks the submitter if the team can help with questions. They acknowledge that after another 30 days of inactivity the contribution will be closed. They also add a
lifecycle/2:inactivelabel to the contribution.
- Community Coordinator asks the submitter if the team can help with questions. They acknowledge that after another 30 days of inactivity the contribution will be closed. They also add a
- After 30 days of inactivity, a contribution becomes orphaned.
- Community Coordinator notes that the contribution has been inactive for 60 days, thanks for the contribution and closes the contribution. They also add an
lifecycle/3:orphanedlabel to the contribution, and adds anUp For Grabslabel to the associated help wanted ticket, if appropriate.
- Community Coordinator notes that the contribution has been inactive for 60 days, thanks for the contribution and closes the contribution. They also add an
Exceptions:
- If the contribution is inactive but shouldn't be closed, the Coordinator adds a
lifecycle/frozenlabel to the contribution. An example of this is when a design decision is being discussed but no decision has been arrived at yet. - Once the contribution reaches the
lifecycle/2:inactivestate, it is eligible to be assumed by another community member interested in working on the ticket. - Invalid PRs may be closed immediately without advancing through this lifecycle, especially if the contributor is unresponsive.